Roadside Park playground equipment being replaced after 27 years

Posted 11/26/26

After 27 years of serving generations of Hastings children, aging playground equipment at Roadside Park is being replaced as the city continues working to address its oldest playground structures. …

This item is available in full to subscribers.

Please log in to continue

Log in

Roadside Park playground equipment being replaced after 27 years

Posted

After 27 years of serving generations of Hastings children, aging playground equipment at Roadside Park is being replaced as the city continues working to address its oldest playground structures. Installation of the new equipment is expected to begin the week of Nov. 23 and take approximately two weeks to complete.

Hastings Parks and Recreation Director Chris Jenkins said Roadside Park was identified by department staff as having the greatest need for playground equipment replacement following an evaluation of existing equipment throughout the city's park system.

Staff consider several factors when evaluating playground equipment, including deterioration of protective coatings, rust, the condition of fasteners, cracked plastic and damaged components. The age of the equipment at Roadside Park also made obtaining replacement parts increasingly difficult.

“This one, we didn't have any options since it was so old to buy a bunch of replacement parts, so it just needed to be a straight replacement,” Jenkins said.

The city's 2026 budget included a $150,000 allocation for playground equipment replacement or smaller trail projects. Following discussions with parks staff about the condition of existing playgrounds, the department identified Roadside Park as a priority. Jenkins said the replacement equipment was ordered approximately eight to 10 weeks ago.

The new playground will look considerably different from the structure that previously occupied the site. While the former playground featured interconnected equipment with ramps and bridges, the replacement will feature a more linear arrangement of play equipment.

Not everything at Roadside Park is being replaced. The large slide will remain, along with the existing swing structure. The swings will receive replacement components, including chains and seats, while the supporting structure remains in good condition.

Conceptual renderings provided by the city show a colorful red, yellow and blue playground featuring multiple slides, climbing structures, rope climbing equipment and spinning play features. The design incorporates a central playground structure surrounded by freestanding equipment, providing a variety of play opportunities for children.

Although installation is taking place late in the year, Jenkins does not anticipate typical early winter snowfall significantly interfering with the work.

Addressing aging playground equipment

The Roadside Park replacement is part of a broader effort to address aging playground equipment throughout Hastings.

Ideally, Jenkins said, playground equipment would be replaced approximately every 20 years. For several years, however, city budgets did not support maintaining that replacement schedule.

“Ideally, we would replace them every 20 years, and for a number of years, the city budget has not supported that,” Jenkins said. “We're getting into a much better spot with that now.”

With more than 20 playgrounds throughout Hastings, maintaining and eventually replacing equipment represents an ongoing investment for the city.

One of the city's more recent playground investments, Lions Park, continues to hold up well. Jenkins said some components of the popular zip line require periodic replacement due to normal wear, but the overall playground structure remains in good condition.

Another playground replacement is scheduled for 2027 at Tuttle Park, but that project is a significantly larger endeavor. That story is available on page ___

What about a splash pad?

Discussion of the Roadside Park improvements on social media has prompted questions about whether a splash pad could be included at the park.

While Jenkins would like to see a splash pad added somewhere in Hastings in the future, he said Roadside Park is not an appropriate location for such a facility. The park's terrain, available space, slopes, tree cover and proximity to Highway 55 are among the factors working against that possibility.

A splash pad would also require consideration of installation and ongoing operating costs, including how water would be supplied and managed.

Jenkins explained that a drain-to-waste system would be less expensive to install than a system that treats and recirculates water. A recirculating system would involve higher installation and maintenance costs but would make more efficient use of water resources.

“At some point, I would like to have a splash pad,” Jenkins said. “I just don't know when that opportunity is going to come about.”

Ultimately, the location, design and funding of a splash pad would require consideration by the Hastings City Council.

For now, the focus at Roadside Park remains on replacing equipment that has served the community for nearly three decades, providing children and families with updated playground equipment while preserving existing features that remain in good condition.